Eliminate the hazards and pitfalls of construction
RAG lists - To Reduce Risk
Are a helpful management risk tool that use a traffic light system of Red, Amber and Green to categorise items based on risk or status. In design they guide designers on what to eliminate (Red), reduce (Amber) or encourage (Green).
- Red items include hazardous procedures, products and processes that must, so far as possible, be eliminated from the design
- Amber items include products, processes and procedures that you should aim to eliminate or at least reduce, so far as possible, and only to remain if it is unavoidable
Provide relevant information on the residual risks
- Green items are ones that provide a safe solution, such as suitable or appropriate edge protection, windows for which there is a safe cleaning method or light fittings where the lamp or bulb can be replaced safely

Significant hazards |
|
|
|
Hierarchy of controls |
|
|
|